A man scaled Tower Bridge forcing police to shut the landmark Thames crossing to traffic. The incident sparked congestion to Limehouse back along the Highway and in the one-way system back to Aldgate.
The final deck segment of the 2.1-mile long viaduct, crossing the Colne Valley in Buckinghamshire, was fixed into place on Thursday by HS2 engineers. The new bridge breaks a 140-year record held ...
Transport for London said that it is running with ... until shortly after midday after the man scaled the bridge at around 10.40am. “Long delays” are still being reported in the area ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results